Skip to main content
Brand: Magtech (0)
Brand: Magtech

Magtech 32SWLA Range/Training 32S&WLong 98gr Lead Round Nose 50 Per Box/20 Case Centerfire, Handgun Ammunition

Hinterland #: 396
MPN: 32SWLA
UPC: 651815003252
Sold out
Hinterland #: 396
MPN: 32SWLA
UPC: 651815003252
Caliber: 32 S&W Long
Bullet Weight: 98 gr
Rounds Per Box: 50

Magtech 32SWLA Range/Training 32S&WLong 98gr Lead Round Nose 50 Per Box/20 Case Centerfire, Handgun Ammunition

$32.12
 
Manufactured to the highest standards for consistent quality and exceptional performance. More shooters rely on Magtech than any other.

Check out the entire range of products from Magtech.

Caliber:32 S&W Long
Bullet Weight:98 gr
Muzzle Energy:108 ft lbs
Model:Range/Training
Casing Material:Brass
Rounds Per Box:50
Bullet Type:Lead Round Nose
Muzzle Velocity:702 fps
Boxes Per Case:20
Application:Target Shooting
 

Customer Reviews